facebook-domain-verification=9fe2ki3waup8yvb6atq666epv0i2s4

Specifications & Functions

  • CSA Pre-Approved for B149.3-15 NFPA 86 compliant.

  • Pre-Assembled with CSA certified components approved for Class I, Div 2 location.

  • Stainless steel fittings.

  • Stainless steel shut off valves.

  • NEMA 4x enclosures.

  • Liquid filled gauges.

  • ACL Valve Train Package comes complete with Controller, High Efficiency Burner, solenoids, junction box and pressure switches.

  • All pre-wired and tested.

  • Total power consumption as low as 3 watts including solenoids.

  • Ambient operating temperature -40°C to +60°C.

  • Power supply 12/24 VDC or Solar.

ACL Fuel Train & Controller 

U.S. Distribution

Tel:  +1-405-703-2745

Email: info@acl-combustion.com

Mailing Address

Box 7528

Oklahoma City, OK 73153

Office Address 

228 S.E. 8th St

Moore, OK 73160

Head Office

Toll-Free: 1-877-638-5234

Tel:  +1-403-638-2287

Email: info@clearrushco.com

Sundre Office Address

5406 Township Rd 325b, 

Sundre, Alberta, Canada

T0M 1X0

Medicine Hat Office Address

Unit # 105
2682 Box Springs Close NW
Medicine Hat, Ab.
*By Appointment Only*

Divisions

  • LinkedIn
  • https://www.instagram.com/clearrushco/
  • Facebook

General Inquiries

Back to Top

BACK TO TOP

© 2020 Clear Rush Co.